Universal Project | STEEL PLANT PROJECT
16114
single,single-portfolio_page,postid-16114,ajax_fade,page_not_loaded,,qode-content-sidebar-responsive,qode-child-theme-ver-1.0.0,qode-theme-ver-9.1.3,wpb-js-composer js-comp-ver-4.11.2.1,vc_responsive
 

STEEL PLANT PROJECT

Scope                        : Door to door/turnkey steel plant project

Duration                   : November 2011 – September 2015

Origin                        : Turkey, China, Italy, USA, Germany, Finland, Switzerland

Destination              : Chehairia/Algeria

Project Description : The biggest investment Turkish Republic has ever done in Algeria. Steel construction, transformers, machineries and general cargoes were shipped within this scope.

 

Total Figures of the Project:

Volume of project&break bulk cargo                  : 220.000 cbm

Weight of project&break bulk cargo                   : 40.000 tons

Number of chartered vessels (sole cargo)        : 25

Number of chartered vessels (part cargo)        : 8

Number of containers (in&out of gauge)           : 1.520 TEU

Number of standard trucks                                 : 3.712

Number of out of gauge trucks                           : 1.248

 

Biggest/Heaviest Items Transported:

Longest  : 36,00 meters overhead crane

Widest    : 7,85(Diameter) meters upper shell

Highest   : 4,85 meters bucket

Heaviest : 123 tons transformer